
Newark Reservoir
Project Scope CA performed the layout and installation of 124 anchor posts for solar arrays at the Newark Reservoir. We also excavated and backfilled for the electrical conduit run from the existing transformer to the new solar equipment. Key Challenges The site was located in a floodplain that was Continue reading